Church Mouse Update 24th August 2025
The musings of one of God’s smallest creatures on events in and around the Parish over the past fortnight . . . .
A very busy time around The Presbytery over the past two weeks as a lot of high level maintenance was completed . . . . . . .
Fr D was delighted that with the arrival of an articulated cherry picker long awaited works at high level on the church building could be commenced. Following the last quin-quennial buildings survey we knew that there was a reasonable amount of ‘at height’ work to be done in order to keep up with the necessary maintenance on the church. Earlier in the year spot-work on the roof tiles was completed (not to fix leaks but to help ensure that leaks do not develop due to tile movement and breakages). It was decided that the most cost effective way to undertake the maintenance of the tower, various wooden features, and high level guttering/downpipes, would not be to use scaffolding (very expensive to erect and take down and then, in between, has to be rented!) but to use a cherry picker.
When the workmen got up to the tower it was not a moment too soon as several isolated sections of rot were discovered which would not have lasted much longer before spreading throughout the structure. Matters were caught just in time and the offending sections were removed and new wood sections made and fitted in before painting (the workmen commented that the wood was just drinking up the undercoat layer!).
Working around the building the cast iron gutters were wire brushed to remove flaking paintwork before being sanded down and repainted with specialist paint; afterwards the same routine was used on the downpipes. When the workmen came to the metal cross above the entrance to the church it was originally assumed to be black but, on rubbing down, it was discovered that it was originally gold in colour, so this was restored.
Whilst we had the equipment on site time was taken to make sure that the various gullies between expanses of tiles were functioning properly - several of them needed to be cleared of old sections of cement which had fallen out and new cement inserted where gaps had formed over the years.
It is hoped that all these works will mean that no major works will be necessary again until between ten and fifteen years time - Fr D certainly hopes that he will never have to face roof works on the church whilst he is still here!
At the time of writing we are waiting for the cherry picker to be collected and returned, giving us back the whole of the car park . . . . . . . .